Window, door and shutter permit

The permit, the forms and the list for your job.

Updated

What are you replacing?

Free. No account.

How long it takes

Its records show

7 days, typically

1 in 10 waits 53 days or more.

What every application carries

  1. Permit application, yellow form

    With the category for your job and the total square feet.

    We fill it in

  2. Contact sheet

    We fill it in

  3. Front views or opening drawing

    You upload it

  4. Product approval of each unit

    We attach it

The exact forms depend on your windows, doors and shutters.See the list for my windows, doors and shutters

Sometimes you also need
  • Permanent (accordion) shutters at a home with an association

    The association’s attestation approving them

    We start it; you finish it

  • The building is over three stories or 50 feet tall, or is an assembly building over 5,000 square feet and 500 people

    Threshold building documents

    Wind calculations, wood buck calculations when the buck is 1½ inches or thicker, the threshold affidavit, a special inspector’s form and an inspection plan from the engineer of record.

    You upload it

  • It is part of a larger permit

    The master permit number, on the application

    We fill it in

  • The owner is acting as their own contractor

    Owner-builder disclosure statement

    The owner reads it before applying and affirms it at the validation appointment.

    • Signed by: The owner

    You upload it

What the reviewers check
  • That each unit has a current notice of acceptance or Florida approval, for the current code: expired approvals from an earlier code are refused.
  • When more than 25% of the glazed openings are replaced, that every one replaced meets the impact rules: impact glass, or an approved impact device on its own shutter permit.
  • That bedroom windows still meet the emergency escape opening sizes.
  • Zoning review for permanent shutters on commercial buildings, condominiums and apartment buildings.
  • That incomplete or illegible applications are turned away.

Source: Miami-Dade County. Updated November 16, 2026. Building regulations in Miami-Dade County.