- Office
- City of Miami Beach
- Applies to
- City limits
- Work
- Roof
Roofing permit
The permit, the forms and the list for your job.
Updated
How long it takes
The office says
7 business days
for each plan review cycle, approximately; most permits take two to three cycles
Its records show
42 days, typically
1 in 10 waits 130 days or more.
What every application carries
Permit application, with the construction cost affidavit
Mark Roofing and opt in or out of the state’s permit timelines. The cost affidavit goes with jobs of $5,000 or more.
- Signed by: The owner or their agent, and the contractor’s qualifier
- Notarized
You fill it in
Signed and sealed roof plan, with dimensions
Drawn to scale, with the scope of work; a site plan with setbacks, property lines, lot dimensions and every structure on the lot; where the gutters and downspouts go; and the current and proposed roofing material and color.
You upload it
Notice of acceptance (NOA) of every roofing material
We attach it
The exact forms depend on your roof.See the list for my roof
Sometimes you also need
It is part of a larger permit
The master building permit number
We fill it in
The property needs a design, historic preservation or adjustment board decision
Recorded board order or determination of architectural significance
Scanned into the plans after the cover sheet.
You upload it
The reviewer asks for them
Wind design calculations
You upload it
The reviewer asks for it
Fire directory listing page
You upload it
You fill it in
What the reviewers check
- Asphalt shingles only with the Planning Department’s prior approval.
- Roof work to Chapter 15 of the Florida Building Code and the High-Velocity Hurricane Zone test protocols.
- Resubmittals answer each comment in a written narrative, with the corrections clouded.
Source: City of Miami Beach. Updated November 16, 2026. Building regulations in City of Miami Beach.